INFO:
Motorists are advised that the highway in the Kīpahulu area of east Maui is closed near Mile 39 from Alelele Bridge to Lelekea Bridge due to erosion damage to the road caused by recent heavy rains. The closure is expected to remain in effect for at least two months while repairs are made to the makai edge of the road.
2 month road closure between Alelele and Lelekea Bridge in East Maui due to erosion : Maui Now